LDP3 Information

What's being proposed? 

01

East Renfrewshire Council is preparing a new Local Development Plan (LDP3), setting out where new homes, businesses and infrastructure will be built across the area up to 2040. The draft plan proposes 855 new homes on Green Belt land at Clarkston South (site reference Strat 1.5) - the fields running from the back of Greenbank Gardens down towards Waterfoot.

A new Local Development Plan

02

Of those 855 homes, 550 are planned within the 10-year plan period to 2037, with the remaining 305 delivered after 2037. That could mean a decade or more of construction traffic, noise and disruption on top of roads, schools and drainage that are already under pressure.

550 homes planned within 10 years

03

Nothing is decided yet. This is a consultation - the Council is asking what residents think, and specific, well-evidenced responses carry real weight. 

Council asking what residents think

04

That's not a quick build. If this goes ahead, phased delivery to 2037 and beyond could mean a decade or more of construction traffic, noise and disruption on your doorstep. More pressure on existing busy roads that lead to local schools.

Phased delivery to 2037 and beyond

05

The same LDP3 plans include additional developments in Eaglesham (660 homes) and Busby (455 homes), and other sites across the area.  This will place additional pressure on infrastructure and service provision.  

Cumulative Impact

The LDP3 process

Source: LDP Planning guide - Licence OGL v3

Development planning runs alongside several checks on its effects: an environmental assessment, an equality assessment, and others. The stages below show where each fits. Dates in brackets are from the Council’s April 2025 timetable, which is out of date and will move, especially if the consultation is extended.

Evidence and Gate Check

The Council gathered evidence, and an independent Reporter checked it before the Plan was drafted. The Gate Check page holds the full body of evidence, including documents listed below.

​

Alongside this: a scoping report for the environmental assessment, sent to the statutory consultation bodies. Their response is on the Gate Check page.

Drafting the Proposed Plan

The Council chose sites, assessed alternatives and appraised transport.

​

Alongside this: the Environmental Report, which assesses each site and the alternatives. The environmental assessment is a legal requirement in its own right (Environmental Assessment (Scotland) Act 2005). It has three statutory consultees: NatureScot, Historic Environment Scotland and SEPA. Its final step is a Post-Adoption Statement, setting out how environmental considerations and consultation responses influenced the final plan.

​

Also alongside: impact assessments for equality, Fairer Scotland (socio-economic disadvantage) and, where required, Habitats Regulations.

Consultation

(now, to 22 January 2027)

The Proposed Plan, Delivery Programme, Evidence Report and Transport Appraisal are published together, with at least 12 weeks for responses.

​

The Environmental Report is consulted on at the same timeline as the Proposed Plan.

The Council considers responses and may change the Plan

(originally October to December 2026)

It publishes a report of the changes, with no further chance to comment on it.

​

If the Plan changes, the Environmental Report is revised and may be consulted on again.

The Plan goes to the Scottish Ministers

(originally January to March 2027)

With a Summary of Unresolved Issues.

Examination

(originally early to mid-2027)

An independent Reporter looks only at the issues raised in responses that the Council hasn’t resolved. They also check that the Council involved the public as it said it would. The Environmental Report is amended after the Examination if needed.

The Reporter’s report, then adoption

(originally around October 2027)

The Council is generally expected to follow the Reporter’s recommendations.

The Scottish Ministers have 28 days to intervene

Before adoption

After adoption

A Post-Adoption Statement on how the environmental findings were taken into account, and the Delivery Programme is adopted within three months.

Further guidance on the planning process

The Scottish Government’s Planning and Environmental Appeals Division reviewed the Council’s evidence before the Plan was drafted. This page holds the Reporter’s findings and the Council’s topic papers.

The Council’s timetable, and its promises on how it will involve the public in preparing LDP3.

The official step-by-step guide to how local development plans must be prepared, consulted on and examined.

Key documents

Start here

The Plan

Supporting documents

Proposals Map 1: Rural and Proposals Map 2: Levern Valley. Printable maps. For Clarkston South, the Interactive Map is clearer.

Other maps

bottom of page